Electronic Two Column Sticker/Tattoo Machine MaintenanceUpdated a month ago
Maintenance
Maintenance Schedule:
☐ Weekly – wipe exterior, check coin tray.
☐ Monthly – clean product slots, inspect weights.
☐ Quarterly – tighten stand bolts, check LCD buttons.
Maintenance Procedure:
- Remove coin tray and clean.
- Inspect weights and empty switch.
- Verify LCD pricing settings.