Machine Racks (4, 5, 6, 7, 8, 9, 10 Unit) Operation & SetupUpdated a month ago
Operation & Setup
- Setup Steps:
- Unbox rack frame and lay out components (base, uprights, crossbars, bolts).
- Assemble rack base and install uprights.
- Secure crossbars to form rack structure.
- Mount vending heads:
- Align heads with bolt holes.
- Use bolts + washers (11mm socket recommended).
- For toy heads, ensure 2” wheel alignment.
- Level rack with feet or casters (if included).
- Fill each head with product and lock lids.
- Test vend all machines to ensure proper operation.