Mini & Jumbo Extreme - Power-On Checklist:Updated 2 months ago
Power-On Checklist:
- Machine plugged into 110V power
- Rear leveling brackets installed if needed
- Volume and music set appropriately for the location
- LED mode and lighting adjusted
- Win percentage and claw strength calibrated
- Prize sensor LED aligned and unblocked
- Test gantry confirms smooth operation and claw grip
- Optional card reader and header plate installed as desired