Rhino Double Head Stand Operation & SetupUpdated a month ago
Operation & Setup
Setup Steps:
- Assemble stand: connect base, pole, and flange.
- If installing only 1 head, use 4 bolts. For both heads, use all 8 bolts to secure.
- Position flange(s) onto stand and align holes.
- Secure with bolts (11mm socket recommended).
- Mount both Rhino Pro machines onto the stand.
- Fill globes with desired product (gumballs, candy, or capsules).
- Lock machines with provided keys.
- Test vend with quarters to confirm both heads operate correctly.
Assembly Video(s):
Product Page:
Rhino Pro Two-Head Bulk Vending Machine with Stand (Candymachines.com)