Rhino Quad Pod Operation & SetupUpdated a month ago
Operation & Setup
Setup Steps:
- Assemble Quad Pod stand (base, pole, cross-support arms).
- Attach mounting plate and align bolt holes.
- Position each Rhino Pro machine onto designated mount.
- Secure with bolts and tighten using 11mm socket.
- Fill each machine with product (gumballs, candy, or capsules).
- Lock each machine with provided keys.
- Test vend each head with coins to confirm smooth operation.
Assembly Video: