Rhino Triple Shop Operation & SetupUpdated a month ago
Operation & Setup
Setup Steps:
- Assemble stand: secure base, pole, and flange.
- Open machine canisters and remove protective packaging.
- Align flange with pre-drilled holes at machine bottom.
- Finger-tighten bolts, then secure with socket wrench (11mm).
- Mount machine securely onto stand by twisting/bolting flange into place.
- Fill each canister with desired product (gumballs, candy, capsules).
- Reinstall lids and lock.
- Test vend each compartment with quarters.
Assembly Video: