Spin ‘N Drop Machine Operation & SetupUpdated a month ago
Operation & Setup
Setup Steps:
- Unbox machine and ensure all components are included (base, pole, globe, coin mech, spiral track, lock/key).
- Attach spiral ramp securely to base.
- Mount globe onto spiral ramp and secure.
- Install coin mechanism in designated slot.
- Fill globe with 1” gumballs.
- Lock the globe and base securely.
- Test vend by inserting a quarter and verifying gumball dispenses properly through the spiral track.
Assembly Video:
How to Assemble – 5’ Spiral Spin N Drop Gumball Machine (YouTube)