SuperPro 2 Toy Machine Operation & SetupUpdated a month ago
Operation & Setup
Setup Steps:
- Unbox machine and confirm all parts are included.
- Assemble stand (if applicable): secure base, pole, and flange.
- Use included bolts to fasten machine to stand (11mm socket recommended).
- Open lid with key and fill with 2” toy capsules or gumballs.
- Reinstall lid and lock securely.
- Test vend using coins to confirm smooth dispensing.
Assembly Videos:
Product Page: