Triple Pod Canister Machine Operation & SetupUpdated a month ago
Operation & Setup
Setup Steps:
- Assemble stand: secure base, pole, and flange.
- Mount canister bracket securely on the stand.
- Position each canister onto the bracket and align bolt holes.
- Tighten bolts with 11mm socket for stability.
- Open each canister and fill with product (gumballs, candy, or capsules).
- Reinstall lids and lock securely.
- Test vend each pod with coins to confirm smooth operation.
Assembly Video:
Product Page:
Rhino Triple Pod Canister Vending Machine (Candymachines.com)