Vendmaster Triple Head Stand Operation & SetupUpdated a month ago
Operation & Setup
Setup Steps:
- Assemble stand: secure base, pole, and flange.
- Position triple mounting plate on top of the stand.
- Place each Vendmaster head on the plate and align bolt holes.
- Use included bolts (11mm socket recommended) to secure all three.
- Open lids with key and fill globes with candy, gumballs, or capsules.
- Reinstall lids and lock securely.
- Test vend each head with coins to confirm proper operation.
Assembly Video:
Product Page:
Vendmaster Triple Vending Machine with Stand (Candymachines.com)